Efficiency in Motion: Hi-Crush Relocates TeleStacker® Conveyor Three Times a Week with Ease

Location Blair, Wisconsin
Industry Frac Sand

Key Insights

Hi-Crush hauls over 900 tons per hour of material from their wet plant to their dry using engineered overland conveyors. Part of their operation also involves using a TeleStacker® Conveyor for stacking finished products.

With Superior’s color-coded parts and “plug and play” technology, the company was able to set-up their conveyor all by themselves.

Before the TeleStacker Conveyor, Hi-Crush was challenged with having little space to stockpile and easily moving to a new stockpile location. Now, the company can easily transition to a new area for stockpiling and finds that they move their conveyor at least three times a week.

Equipment
  • Overland Conveyor
  • TeleStacker® Conveyor
Hi-Crush frac sand industry using TeleStacker Conveyor
vertical-divider-white-1
cta-optimizeu
OptimizeU

On-Demand Learning for Aggregate Producers

With seasoned operators retiring and fresh faces joining the crew, OptimizeU delivers interactive, on-demand training in crushing, screening, washing, and conveying—accelerating learning and supporting your path to consistent production.

We’re Ready When You Are!

Talk to our team or find a dealer near you.